Caulfield to Dandenong Level Crossing Removal

Cassaform was engaged to provide a formwork system capable of forming the derailment kerb for the Caulfield to Dandenong level crossing removal project.

Cassaform’s scope was to provide the design, supply and certification of a system capable of forming large runs of 800mm high x 200mm thick insitu walls. The total length required was 10,000m, this would be completed in 200m segments within 8-12weeks.

The project was completed ahead of schedule to the client’s satisfaction using Cassaform’s modular wall formwork system.