P300 Column Formwork Melton – Case Study

Cassaform P300 Column Formwork
Project of the Week: Cassaform has supplied this week the Column Formwork for the Year 9 Cadel Centre in Melton. The product was put to the challenge which was asked, can you form 1 column in less then 2 hours without using Z-Tie holes through mass concrete? The answer was yes! Using our P300 Adjustable Column System, our client can form various column widths and achieved a great result forming 10 columns of various size within the day of delivery and ready for Pour.
Would you like to find out how you could form your next Column as fast as these?
At Cassaform, we have a wide range of formwork and propping systems to suit your needs. So for all your suspended slab, formworks and propping requirements,
Call 1300 745 674 NOW!