Carnegie Project – Case Study

Cassaform were engaged to engineer, design and supply a fast and reliable formwork system, allowing the contractor to not only save budget but also materials.

Overview of Job: The project was a medium density residential development featuring eight generously sized townhouses in one of the city’s most emerging suburbs. Construction involved a basement and suspended RC floor system about 800 square meters.

Key Features: Construction involved an underground garage and suspended RC floor system about 800 square meters.

Product used: Cassform SuperShore formwork system & Engineering and Design Services.

Cassaform’s involvement: Cassaform were engaged to engineer, design and supply a fast and reliable formwork system, allowing the contractor to not only save budget but also materials.

Feedback from job or results following completion: The client was satisfied with the engineering services and gear provided. The formwork construction is still on-going as of this writing. 

 

Click here to learn more about our Super Shore Frames.

Click here to read about our Temporary Engineering Services.

Click here to request a call from our friendly team.

Click here to view more case studies.

by Cassaform